Chapter 5
STEP 1. LAYOUT, AND SETTING UP PACKING CLAMPS
1. Anchor the risers at the connector links including the
steering lines. [Figure 5-71]
2. Place packing weight on top of it.
3. Pull the slider down to the connector links. Make
sure the tapes face upward toward the canopy.
[Figure 5-72]
4. Lay the canopy on its right side. (Note: A mirror image
of the layout is permissible).
5. Flake the canopy so the top seams are even. Place a
clamp on the top of the canopy in line with each line
attachment point as in figure 5-73 on page 5-34.
|